Norman Global Ltd
Norman Global Ltd
  • Home
  • Services
  • Curtain Walling
    • Stick Curtain Walling
    • Unitised Curtain Walling
  • Projects
  • Contact us
  • More
    • Home
    • Services
    • Curtain Walling
      • Stick Curtain Walling
      • Unitised Curtain Walling
    • Projects
    • Contact us
  • Home
  • Services
  • Curtain Walling
    • Stick Curtain Walling
    • Unitised Curtain Walling
  • Projects
  • Contact us

Unitised Curtain Wall (UCW)

High-Rise Unitised Curtain Wall (UCW) Installation

At Norman Global Ltd, unitised curtain wall (UCW) panel installation on high-rise commercial structures is our core strength. Modern high-rise envelopes demand precision floor-by-floor execution, rapid panel drops, and strict adherence to structural movement tolerances. We provide specialist, fully managed labor packages and elite fixing gangs built specifically for Tier-1 mega-projects.


We deploy fully ticketed 4-man specialist units equipped to manage every stage of the floor package from baseline laser setting-out to final stack-joint weatherproofing. Working under Tier-1 site RAMS or directly under our own SSSTS operational management, we ensure your building envelope is closed out safely, accurately, and ahead of schedule.


Our Specialist UCW Capabilities:


Millimetre-Precision Setting Out: High-accuracy laser layout of floor slab cast-in channels, bracket alignment, and dead-load anchor positioning before cassette delivery.


Controlled Heavy Panel Lifting: Safe, efficient handling of double- and triple-glazed unitised cassettes using floor-mounted monorail hoists, spider cranes, and specialised vacuum lifting frames.


Slab Edge & External Fixing Operations: Expert coordination between internal slab-edge fixers and external access teams (MEWPs, mastclimbers, or rigs) to guide bottom alignment pins and engage split-mullion stack joints.


Stack Joints & EPDM Weatherproofing: Meticulous installation of interlocking gaskets, primary weather seals, and internal EPDM membranes to guarantee air- and water-tight integrity.


Quality Assurance & Torque Verification: Rigorous bracket bolt torque checking, panel leveling, and digital QA sign-off reporting prior to floor handovers.


100% Accredited Squads: Every squad is led by an SSSTS Site Supervisor and supported by CSCS Blue Card (NVQ L2 Curtain Walling ) fixers, CPCS/ALLMI Slinger Signallers, and IPAF 3a/3b operators.

Workers installing a large glass panel on a building.

Copyright © 2026 Norman Global Ltd  - All Rights Reserved.

Est 2023 - United Kingdom (UK)

  • Privacy Policy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept